ASLAN CEMENT
- ANNUAL ELECTRIC MAINTENANCE WORKS CONTRACT.
Kocaeli

2013- 2014 ANNUAL ELECTRIC MAINTENANCE WORKS CONTRACT
- 2013- 2014
- OYAK
- ASLAN ÇİMENTO
- ANNUAL ELECTRIC MAINTENANCE WORKS CONTRACT.
Kocaeli

WHR PLANT INFRASTRUCTURE PROJECTS, ELECTRICAL INSTALLATIONS, INSTRUMENT INSTALLATIONS, MV TESTING AND COMMISSIONING.
- 2014
- OYAK
- ASLAN CEMENT
- Kocaeli / DARICA
- WHR PLANT INFRASTRUCTURE PROJECTS, ELECTRICAL INSTALLATIONS,
- INSTRUMENT INSTALLATIONS,
- MV TESTING AND COMMISSIONING.
Kocaeli

Annual Electricity Maintenance Contract
- 2014-2015
- OYAK
- Annual Electricity Maintenance Contract
Kocaeli

OHS BUILDING ELECTRICAL SYSTEMS PROJECTING AND INSTALLATION
- 2015
- OYAK
- OHS BUILDING ELECTRICAL SYSTEMS PROJECTING AND INSTALLATION
- LIGHTING PANEL AND LIGHTING SYSTEM
- FIRE ALARM SYSTEM AND SOUND SYSTEM
- PROJECT AND INSTALLATION OF TELEPHONE AND DATA SYSTEMS
Kocaeli

INSTALLATION OF NEW DISTRIBUTION BOARDS WITH THE INSTALLATION OF C TRAFOSU MCC PANELS
- 2015
- OYAK
- INSTALLATION OF NEW DISTRIBUTION BOARDS WITH THE INSTALLATION OF C TRAFOSU MCC PANELS
- CONSTRUCTION OF NETWORK CABLES
- CONSTRUCTION AND CIRCUIT OF NETWORK CABLE CONNECTIONS
Kocaeli

Aslan Cement (Oyak)
- CD1 roller press project electrical equipment and cable montage, dismentling and work on the turn-key of the work done.
- -Project works and cable lists, preparation of connection plans
- -All field montages
- -Project and field management
- -Supervisor support
- -Testing and commissioning works
Kocaeli

Oyak Annual Maintenance (Aslan Cement)
- Annual electrical maintenance contract
Kocaeli

CEMENT MECHANISM PLC SYSTEM SOFTWARE UPDATE WORKS
- 2013
- AS MADENCİLİK
- MİLAS ÇİMENTO
- MUĞLA/MİLAS
- CEMENT MECHANISM PLC SYSTEM SOFTWARE UPDATE WORKS.
Muğla

M4 FARIN MILL PROJECT STUDIES
- 2014
- AS MINING
- BURDUR
- RM4 FARIN MILL PROJECT, PLC SYSTEMS INSTALLATION AND COMMISSIONING,
- MV SYSTEMS TESTING AND COMMISSIONING.
Burdur

REVISION ELECTRICAL MAINTENANCE WORKS
- 2014
- OYAK
- ÜNYE ÇİMENTO
- ORDU/ÜNYE
- REVISION ELECTRICAL MAINTENANCE WORKS.
Ordu

REVISION ELECTRICAL MAINTENANCE WORKS
- 2015
- OYAK
- ÜNYE ÇİMENTO
- ORDU/ÜNYE
- REVISION ELECTRICAL MAINTENANCE WORKS
Ordu

TESTING AND COMMISSIONING STUDIES
- 2015
- OYAK
- ÜNYE ÇİMENTO
- ORDU/ÜNYE
- 31.5 kV MAIN BUSH REASSEMBLY 8 ASSEMBLY AND INSTALLATION WORKS
- TESTING AND COMMISSIONING STUDIES
Ordu

WHR PLANT MV TESTING AND COMMISSIONING
- 2014
- OYAK
- BOLU ÇİMENTO
- WHR PLANT MV TESTING AND COMMISSIONING
Ordu

Adıyaman cement rotary kiln revision and automatize (Çimko)
- Preparation of main distribution, compensation, mcc2, mcc3, mcc4 and cooling system panels, manufacturing of panels, field installation, testing and commissioning.
-
- Making the project of PLC panels, making board manufacturing, supplying, assembling, testing and commissioning of CPU cabins, server cabins, server computers and all communication devices and equipments. PLC software and engineering services.
-
- Montage of cables, cable trays and equipments.
-
- Supply, installation, test and commissioning of pressure transmitters and all converting devices.
Adıyaman

Bartın Cement (Bilim Makina)
- Bartin is required for the new elevator to be added to the furnace line inside the cement plants
- -MCC panel manufacture
- -I / O panel modifications
- -More electrical montage
- It covers the services to be provided in their subjects.
Bartın

Sanko Bartın Cement WHR Project
Bartın

DENİZLİ CEMENT PACKAGING AND HOROMYL MILL AUTOMATION SYSTEM
- 2016
- ROCKWELL OTOMASYON TİC.AŞ.
- DENİZLİ ÇİMENTO
- DENİZLİ CEMENT PACKAGING AND HOROMYL MILL AUTOMATION SYSTEM
- MAKING PLC PAN DRAWINGS
- CONSTRUCTION OF PLC PANEL MANUFACTURING
- PLC SOFTWARE MANUFACTURING
- TEST AND CIRCULATION WORKS
Denizli

MV board revisions (Nuh Çimento)
- Nuh Çimento medium voltage board revisions
Kocaeli

Siten Furnace 1 and Hot Gas Genrators Furnace 2 6.3 kV Panel disassembly SIEMENS NXAIR panel installation
- Nuh Çimento medium voltage board revisions
Kocaeli

Raw Mill 6.3 kV panel disassembly, SIEMENS NXAIR panel assembly.
- Nuh Çimento medium voltage board revisions
Kocaeli

Installation of new furnace elevator AG panel, automation panels and field devices.
- AG panel, automation panels and field devices
Kocaeli

2 Roller Press electrical systems installation works.
- 8BT2 34.5 kV Panel mountings, 0.4 kV SIVACON MCC mountings, PLC panel mountings, LV Driver panel mountings, secondary and control panel mountings.
Kocaeli

Silo 9 Electrical works
- 8BT2 34.5 kV Panel mountings, 0.4 kV SIVACON MCC mountings, PLC panel mountings, LV Driver panel mountings, secondary and control panel mountings.
Kocaeli