References
Energy
SIEMENS
İstanbul
RTU, PLC VE ET200M PANEL PROJE ÇİZİMİ
  • WEST QURNA IRAK
İstanbul
S7300, S7400 PANEL AND INTERFACE PROJECTS PREPARATION
  • 2014
  • SIEMENS
  • ADNAN MENDERES AIRPORT
  • IZMIR
  • PREPARATION OF S7300 AND S7400 PANEL PROJECTS.
  • PREPARATION OF INTERFACE PROJECTS.
İzmir
AKSA GÖYNÜK Project T3000 Software jobs
  • 2015
  • AKSA GÖYNÜK
  • SIEMENS
  • AKSA GÖYNÜK Project T3000 Software jobs
Bolu
Rectifier Panel Assembly and OG Cable Headlines production jobs
  • 2014
  • Siemens
  • Parsan
  • Rectifier Panel Assembly and OG Cable Headlines production jobs
Giresun
7 Piece 8BT3 Dashboards test tested and Commissioning Getting
  • 2015
  • Toyotetsu
  • Siemens
  • 7 Piece 8BT3 Dashboards test tested and Commissioning Getting
Kocaeli
Kadıköy-Adalar İski Project (Siemens)
  • AG board assembly, new AG board and compensation panel implements and testing within Kadıköy-Adalar İski project.
İstanbul
Ümraniye, Üsküdar, Çekmeköy Metro Project (Siemens)
  • 144 piece 8BT2 and 4 piece Nxair Og cell montage to Ümraniye, Üsküdar, Çekmeköy metro stations.
İstanbul
İski ikitelli clean water pumping station (Siemens)
  • 8DA cell-specific Phisterer MV cable header supply, construction, supply, supply of Raychem OG cable header. Manufacture, installation and commissioning of control pult.
  • Supply and installation of all cables.
  • New cable assembly and testing of scada old cables.
Denizli
Nefise Akçelik Tüneli Retrofit
Ordu
E-House Project
Hatay
Sabiha Gökçen Airport Siemens Simoprime cell displacement
İstanbul
ESA Industrial Plants
  • Field Project Responsibility-Technical Consultancy-Hardware Project Drawing
Amasya
KESİR MÜHENDİSLİK
Samsun
UNILEVER SANAYİ VE TİCARET A.Ş
  • 2013
  • UNILEVER SANAYİ VE TİCARET A.Ş
  • MARGARIN MACHINE CONVEYOR AUTOMATION INSTALLATION.
Tekirdağ
CONVEYOR SYSTEM AUTOMATION INSTALLATION AND COMMISSIONING.
  • 2014
  • ATU KONVEYÖR
  • BOYÇELİK
  • KAYSERİ
  • CONVEYOR SYSTEM AUTOMATION INSTALLATION AND COMMISSIONING.
Kayseri
PRESS WASTE PARTS TRANSMISSION LINE AUTOMATION.
  • 2014
  • ATU KONVEYÖR
  • AKA
  • BURSA
  • PRESS WASTE PARTS TRANSMISSION LINE AUTOMATION.
Bursa
MOBILE 1 SCADA INSTALLATION STUDIES
  • 2014
  • KARADENİZ ENERJİ
  • SİLOPİ
  • MOBILE 1 SCADA INSTALLATION STUDIES
Şırnak
EMERGENCY ESCAPE PLAN PROJECT DRAWINGS AND INSTALLATION
  • 2015
  • MARMARA FORM
  • İSTANBUL
  • EMERGENCY ESCAPE PLAN PROJECT DRAWINGS AND INSTALLATION
İstanbul
ALAŞEHİR GEOTHERMAL DEPARTMENT OF ENERGY AND NATURAL RESOURCES ACCEPTANCE TESTS
  • 2015
  • ZORLU
  • ALAŞEHİR JEOTERMAL
  • ALAŞEHİR GEOTHERMAL DEPARTMENT OF ENERGY AND NATURAL RESOURCES ACCEPTANCE TESTS
Manisa
Oyka Paper Coal-Fired Steam Boiler Electrical Installation Works
Zonguldak
Aslan cement OG displacement works
Kocaeli
Ermaden OG driver Assembly
  • MV driver installation, cable pan installation, cable shooting, MV motor installation and installation, commissioning support.
Sivas