Refinery
10 PCS 6.3 kV CELL UNIT AND 12 PCS 6.3 kV NXAIR CELL MOUNT.
  • 10 PCS 6.3 kV CELL UNIT AND 12 PCS 6.3 kV NXAIR CELL MOUNT.
İzmir
PLANT 9 PROJECT DRAWING.
  • PLANT 9 PROJECT DRAWING.
Kocaeli
POMPA İSTASYONU PROJE ÇİZİMİ
  • PUMP STATION PROJECT DRAWING
Sakarya
PREPARATION OF MEDIUM VOLTAGE CURRENT ROAD PROJECTS
Kocaeli
OFF SHADOW RTU PROJECT DRAWING.
Kocaeli
SLS / PANEL PROJECT DRAWING.
Kocaeli
ELECTRICAL LOADING SYSTEM RTU PANEL PROJECTS PREPARATION.
  • 2013
  • SIEMENS
  • TÜPRAŞ RAFİNERİSİ
  • KOCAELİ/KÖRFEZ
  • ELECTRICAL LOADING SYSTEM RTU PANEL PROJECTS PREPARATION.
Kocaeli
RTU, PLC PANEL PROJECT DRAWING
  • 2014
  • SIEMENS
  • TÜPRAŞ RAFİNERİSİ
  • İZMİR/ÇAKMAKTEPE
  • RTU, PLC PANEL PROJECT DRAWING
İzmir
PREPARATION OF PLC, JB AND FIELD INTERFACE PROJECTS.
  • 2014
  • SIEMENS
  • TÜPRAŞ REFINERY
  • Kocaeli / GULF
  • STEAM LOADING SYSTEM
  • PREPARATION OF PLC, JB AND FIELD INTERFACE PROJECTS.
  • JB MANUFACTURING.
  • FIELD EQUIPMENT INSTALLATIONS.
Kocaeli
154 kV RTU Panel and Kojan RTU Panel Drawing.
  • SİEMENS
  • 154 kV RTU Panel and Kojan RTU Panel Drawing.
  • TUPRAS Refinery
  • 2014
Kocaeli
ALİAGA 3 Piece RTU (SS 1100, SS 1400, SS 2056) Panel Drawing.
  • 2014
  • SİEMENS
  • TÜPRAŞ Refinery
  • ALİAGA 3 Piece RTU (SS 1100, SS 1400, SS 2056) Panel Drawing.
  • 2 Piece PLC (SS 1400, TS 1400) Panel Drawing.
İzmir
Tüpraş İzmir TDM Discharging Work
  • 5 Siemens nxpuls cell displacement
İzmir
Tüpraş Izmit cooling tower AG panel modarnization project)
  • 5 Pie. Siemens Sivecon Panel mounting
Kocaeli